AI specialist · Power Delivery

Wyatt finds what blocks power delivery.

For site selection and development teams. Separates requested, contracted, and energized megawatts before saying anything about dates.

Runs inside Compute Desk · Approved organization account required

Wyatt

Power Delivery · AI specialist

Answers
What blocks power delivery for this site and phase?
Delivers
Time-to-power review with prerequisites, capacity basis, unresolved dates, and utility questions.

Named for the watt.

How a review with Wyatt works.

  1. 1

    You bring

    Site, utility, phase, IT load, target date, and utility documents.

    Missing context is named, not filled in

  2. 2

    Wyatt checks

    Reviews your inputs against cited sources, separates evidence from assumption, and names what is missing.

    Every answer cites evidence or is rejected

  3. 3

    You get

    A saved review with sections for Decision, Capacity basis, Prerequisites, Unresolved dates, and Questions for the utility, plus evidence, assumptions, confidence, and suggested handoffs.

    Sources and assumptions shown

  4. 4

    Your team decides

    A recommendation to commit capital, sign a contract, change a hedge or production operations, contact a counterparty, or file with a regulator waits for a named approver on your team.

    Named approver and written reason

When you approve it, Wyatt can cite a GreenCIO calculation run on figures you enter: Time-to-power screen, Site evidence gap check and Critical path. The specialist never runs a calculator on its own.

Wyatt in a review.

The shape of the answer, from finding to open question.

Northern Virginia · Phase one

Illustrative

The 24 MW request is not yet a utility commitment.

Input
Proposed facility load: 60 MW total, with 24 MW requested for phase one by Q4 2029.
Still needed
A utility load study, then an executed service agreement for the 24 MW.
Open question
Can the utility serve the first phase by the requested date?

What Wyatt will not claim.

  • Never counts requested or announced megawatts as deliverable capacity.
  • Has no confidential utility interconnection studies or live grid telemetry.
  • A recommendation to commit capital, sign a contract, change a hedge or production operations, contact a counterparty, or file with a regulator waits for a named approver on your team.

Bring Wyatt a site you are evaluating.

In a 30-minute session, we’ll walk through Wyatt’s review and identify the information needed next.