Archived research directory

AI data center source records

archival

A cited Epoch AI GPU Clusters snapshot committed on August 23, 2025. It is not a live or complete facility master.

394
Cited records
104
Planned / construction
32
Countries in snapshot
40.9 GW
Power total (366 rows)

Dataset status and rights

This is an archival research snapshot, not a continuously verified facility master. The exact source artifact entered this repository on ; its original retrieval time was not recorded. Every published row retains at least one source citation, source status/certainty where available, and the basis for its power value. Rows without citations or valid map coordinates are excluded.

Attribution: Epoch AI, Epoch AI GPU Clusters (CC BY). GreenCIO does not add renewable share, carbon class, grid-risk, weekly-update, or projected-capacity scores to this snapshot.

Cited facility records

Showing 394 of 394 publishable records

Abu Dhabi UAE/USA 5GW Campus Phase 2

US Companies,G42 · United Arab Emirates

Planning
Power capacity
5000 MW
reported by source
First operational
Not available
as recorded in snapshot
Public/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

AGH Cyfronet Athena

AGH University of Krakow · Poland

Operational
Power capacity
0.327 MW
reported by source
First operational
2022-06-01
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 3 additional sources

AGH Cyfronet Helios

AGH University of Krakow · Poland

Operational
Power capacity
0.53 MW
reported by source
First operational
2024-06-01
as recorded in snapshot
NVIDIA GH200NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Ahrefs Yep1

Ahrefs · United States of America

Operational
Power capacity
0.719 MW
reported by source
First operational
2024-06-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

AIRAWAT-PSAI Phase 2

Center for Development of Advanced Computing (C-DAC) · India

Operational
Power capacity
0.544 MW
reported by source
First operational
2023-05-23
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

AIST ABCI 1.0

National Institute of Advanced Industrial Science and Technology (AIST) · Japan

Operational
Power capacity
2.994 MW
reported by source
First operational
2018-06-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

AIST ABCI 2.0

National Institute of Advanced Industrial Science and Technology (AIST) · Japan

Operational
Power capacity
2.818 MW
reported by source
First operational
2021-05-30
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

AIST ABCI 3.0

National Institute of Advanced Industrial Science and Technology (AIST) · Japan

Operational
Power capacity
8.588 MW
reported by source
First operational
2025-01-20
as recorded in snapshot
NVIDIA H200 SXMNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

AIST ABCI-Q

National Institute of Advanced Industrial Science and Technology (AIST) · Japan

Operational
Power capacity
2.87 MW
reported by source
First operational
2025-06-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Aleph Alpha alpha ONE

Aleph Alpha · Germany

Operational
Power capacity
0.436 MW
reported by source
First operational
2022-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Alps Supercomputer Phase 1

ETH Domain · Switzerland

Operational
Power capacity
8.682 MW
reported by source
First operational
2024-06-01
as recorded in snapshot
NVIDIA GH200NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Alps Supercomputer Phase 2

ETH Domain · Switzerland

Operational
Power capacity
11.909 MW
reported by source
First operational
2024-09-17
as recorded in snapshot
NVIDIA GH200NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 4 additional sources

Amazon Titan training cluster

Amazon · United States of America

Operational
Power capacity
11.42 MW
reported by source
First operational
2023-01-15
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Andreessen Horowitz Oxygen

Andreessen Horowitz · United States of America

Operational
Power capacity
28.538 MW
reported by source
First operational
2024-10-23
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Applied Digital CoreWeave Ellendale Phase 1

Applied Digital · United States of America

Planning
Power capacity
100 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Applied Digital CoreWeave Ellendale Phase 2

Applied Digital · United States of America

Planning
Power capacity
250 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Applied Digital Ellendale Possible Phase 3

Applied Digital · United States of America

Planning
Power capacity
400 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Aramco Groq Inference Cluster

Saudi Aramco · Saudi Arabia

Operational
Power capacity
8.49 MW
reported by source
First operational
2025-01-15
as recorded in snapshot
GroqChip LPU v1Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Argonne NL Aurora

US Department of Energy · United States of America

Operational
Power capacity
60 MW
reported by source
First operational
2024-05-13
as recorded in snapshot
Intel Data Center GPU Max 1550IntelPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Argonne NL Polaris

US Department of Energy · United States of America

Operational
Power capacity
1.924 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Argonne NL Sophia (Formerly Theta)

US Department of Energy · United States of America

Operational
Power capacity
0.168 MW
reported by source
First operational
2020-05-30
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Atos Spartan2

Cloud · France

Operational
Power capacity
0.189 MW
reported by source
First operational
2020-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

AWS EC2 P4d

Amazon · United States of America

Operational
Power capacity
3.494 MW
reported by source
First operational
2020-11-02
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

AWS EC2 P5 UltraClusters

Amazon · United States of America

Operational
Power capacity
29.047 MW
reported by source
First operational
2023-07-26
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

AWS EC2 Trn1

Amazon · United States of America

Operational
Power capacity
Not available
not available
First operational
2022-10-11
as recorded in snapshot
Amazon Trainium1Amazon AWSPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

AWS Fast BERT Training

Amazon · United States of America

Operational
Power capacity
1.364 MW
reported by source
First operational
2019-12-03
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Azure OpenAI GPT-3 Cluster

Microsoft,OpenAI · United States of America

Operational
Power capacity
6.552 MW
reported by source
First operational
2020-04-15
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Brazil Scala AI City Phase 1

Scala Data Centers · Brazil

Planning
Power capacity
54 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Brazil Scala AI City Phase 2

Scala Data Centers · Brazil

Planning
Power capacity
4750 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely

Calcul Québec Béluga

Compute Canada · Canada

Operational
Power capacity
0.437 MW
reported by source
First operational
2019-04-26
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Calcul Québec Narval

Compute Canada · Canada

Operational
Power capacity
0.548 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Cambridge Dawn Phase 2

UK Research and Innovation · United Kingdom of Great Britain and Northern Ireland

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Public
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

CEA EXA1-HE Phase 2

French Alternative Energies and Atomic Energy Commission (CEA) · France

Operational
Power capacity
2.018 MW
reported by source
First operational
2024-04-17
as recorded in snapshot
NVIDIA GH200NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Center for Advanced Intelligence Project, RIKEN, RAIDEN

RIKEN · Japan

Operational
Power capacity
0.201 MW
reported by source
First operational
2018-06-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Chan Zuckerberg Initiative GPU Cluster

CZ Biohub Network,CoreWeave · United States of America

Operational
Power capacity
1.435 MW
reported by source
First operational
2025-01-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Cineca Marconi-100

Cineca · Italy

Operational
Power capacity
2.644 MW
reported by source
First operational
2020-04-20
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Commissariat a l'Energie Atomique Topaze

French Alternative Energies and Atomic Energy Commission (CEA) · France

Operational
Power capacity
0.165 MW
reported by source
First operational
2021-06-23
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Condor Galaxy 1 (CG-1)

G42,Cerebras Systems · United States of America

Operational
Power capacity
Not available
not available
First operational
2023-11-13
as recorded in snapshot
Cerebras CS-2CerebrasPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 3 additional sources

Condor Galaxy 3 (CG-3)

G42,Cerebras Systems · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Cerebras CS-3CerebrasPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 3 additional sources

Continental DGX Supercomputer

Continental AG · Germany

Operational
Power capacity
0.294 MW
reported by source
First operational
2020-07-28
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Core42 SuperPOD

G42 · United Arab Emirates

Operational
Power capacity
1.815 MW
reported by source
First operational
2024-10-30
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

CoreWeave Denton GB200s OpenAI/Microsoft

CoreWeave · United States of America

Planning
Power capacity
260 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Coreweave EcoDataCenter

CoreWeave · Sweden

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely

CoreWeave H200s

CoreWeave · United States of America

Operational
Power capacity
59.929 MW
reported by source
First operational
2024-08-28
as recorded in snapshot
NVIDIA H200 SXMNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

CoreWeave Hillsboro Oregon

CoreWeave,Digital Realty · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

CoreWeave LiquidLab

CoreWeave · United States of America

Operational
Power capacity
5.606 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

CoreWeave Muskogee

CoreWeave · United States of America

Planning
Power capacity
100 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

CSC Puhti

CSC – IT Center for Science · Finland

Operational
Power capacity
0.213 MW
reported by source
First operational
2019-09-03
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

CSCS Piz Daint Phase 1

ETH Domain · Switzerland

Operational
Power capacity
1.812 MW
reported by source
First operational
2016-11-01
as recorded in snapshot
NVIDIA Tesla P100 PCIe 16GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

CSCS Piz Daint Phase 2

ETH Domain · Switzerland

Operational
Power capacity
4.374 MW
reported by source
First operational
2017-06-01
as recorded in snapshot
NVIDIA Tesla P100 PCIe 16GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

CSIRO Virga

CSIRO · Australia

Operational
Power capacity
0.639 MW
reported by source
First operational
2024-07-11
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

DataVolt Neom 1.5 GW Phase 1

DataVolt · Saudi Arabia

Planning
Power capacity
300 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

DataVolt Neom 1.5 GW Phase 2

DataVolt · Saudi Arabia

Planning
Power capacity
1500 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

DeepL Mercury

DeepL · Sweden

Operational
Power capacity
0.79 MW
reported by source
First operational
2023-08-02
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Dell Rattler

Dell Technologies · United States of America

Operational
Power capacity
0.165 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Denvr Dataworks H100

Denvr Dataworks · United States of America

Operational
Power capacity
1.461 MW
reported by source
First operational
2024-10-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Energy Company DD

Unknown · United States of America

Operational
Power capacity
1.236 MW
reported by source
First operational
2016-06-15
as recorded in snapshot
NVIDIA Tesla K80NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Eni HPC2

Eni · Italy

Operational
Power capacity
1.411 MW
reported by source
First operational
2014-11-15
as recorded in snapshot
NVIDIA Tesla K20XNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Eni HPC4 Phase 1

Eni · Italy

Operational
Power capacity
2.482 MW
reported by source
First operational
2018-01-18
as recorded in snapshot
NVIDIA P100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Eni HPC4 Phase 2

Eni · Italy

Operational
Power capacity
1.987 MW
reported by source
First operational
2021-10-30
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Eni HPC5

Eni · Italy

Operational
Power capacity
4.034 MW
reported by source
First operational
2020-02-21
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Eni HPC6

Eni · Italy

Operational
Power capacity
14.155 MW
reported by source
First operational
2024-11-18
as recorded in snapshot
AMD Radeon Instinct MI250XAMDPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

EuroHPC Karolina

EuroHPC JU · Czechia

Operational
Power capacity
0.548 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

EuroHPC Leonardo

EuroHPC JU · Italy

Operational
Power capacity
12.598 MW
reported by source
First operational
2022-11-22
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

EuroHPC LUMI

EuroHPC JU · Finland

Operational
Power capacity
12.092 MW
reported by source
First operational
2022-09-15
as recorded in snapshot
AMD Radeon Instinct MI250XAMDPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 3 additional sources

EuroHPC MeluXina

EuroHPC JU · Luxembourg

Operational
Power capacity
0.687 MW
reported by source
First operational
2021-06-07
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

EuroHPC Vega

EuroHPC JU,Institute of Information Science (IZUM) · Slovenia

Operational
Power capacity
0.155 MW
reported by source
First operational
2021-04-01
as recorded in snapshot
NVIDIA A100 PCIeNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

ExxonMobil Discovery 5

ExxonMobil · United States of America

Operational
Power capacity
1.683 MW
reported by source
First operational
2022-11-01
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Fastweb NeXXt AI Factory

Fastweb · Italy

Operational
Power capacity
0.354 MW
reported by source
First operational
2024-07-09
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Fluidstack France Gigawatt Campus

Mistral · France

Planning
Power capacity
1000 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Foxconn Big Innovation Cloud AI factory

Foxconn · Taiwan

Planning
Power capacity
29.53 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB300NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Foxconn Hon Hai Kaohsiung Supercomputer

Foxconn · Taiwan

Planning
Power capacity
11.07 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

FPT AI Factory Japan

FPT Corporation · Japan

Planning
Power capacity
4.204 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

FPT AI Factory Vietnam

FPT Corporation · Vietnam

Planning
Power capacity
4.204 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

FZJ JURECA

Julich Supercomputing Center · Germany

Operational
Power capacity
0.676 MW
reported by source
First operational
2021-06-23
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

G42 Artemis

G42 · United Arab Emirates

Operational
Power capacity
1.226 MW
reported by source
First operational
2019-11-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

G42 Microsoft 100Mw UAE Cluster

G42,Microsoft · United Arab Emirates

Planning
Power capacity
100 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

G42 Microsoft 30Mw UAE Cluster A

G42,Microsoft · United Arab Emirates

Planning
Power capacity
30 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

G42 Microsoft 30Mw UAE Cluster B

G42,Microsoft · United Arab Emirates

Planning
Power capacity
30 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Gcore data center Phase 1

Gcore,NHN Corporation · Korea (Republic of)

Operational
Power capacity
0.457 MW
reported by source
First operational
2024-04-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Gcore data center Phase 2

Gcore,NHN Corporation · Korea (Republic of)

Planning
Power capacity
1.902 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Gemini 1.0 Ultra training cluster A

Google · United States of America

Operational
Power capacity
10.113 MW
reported by source
First operational
2023-08-20
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Gemini 1.0 Ultra training cluster B

Google · United States of America

Operational
Power capacity
10.113 MW
reported by source
First operational
2023-08-20
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

GENCI Adastra

GENCI · France

Operational
Power capacity
1.609 MW
reported by source
First operational
2022-06-01
as recorded in snapshot
AMD Radeon Instinct MI250XAMDPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Google A3 VMs

Google · United States of America

Planning
Power capacity
36.436 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Google Council Bluff Iowa

Google · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Google Lancaster Ohio

Google · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Google Lincoln Nebraska

Google · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Google MLPerf 0.7 Submission

Google · United States of America

Operational
Power capacity
1.968 MW
reported by source
First operational
2020-07-29
as recorded in snapshot
Google TPU v3GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Google New Albany Ohio

Google · United States of America

Planning
Power capacity
450 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Google Oklahoma TPU v4 Pods

Google · United States of America

Operational
Power capacity
11.862 MW
reported by source
First operational
2022-05-12
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Google Omaha Nebraska

Google · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Google Papillion Nebraska

Google · United States of America

Planning
Power capacity
250 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Google south Columbus Ohio

Google · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Google TensorFlow Research Cloud

Google · United States of America

Operational
Power capacity
2.693 MW
reported by source
First operational
2017-05-17
as recorded in snapshot
Google TPU v2GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Google TPU v4 Pod

Google · United States of America

Operational
Power capacity
1.495 MW
reported by source
First operational
2021-05-19
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

GreenNode Bangkok Cluster

VNG Corporation · Thailand

Operational
Power capacity
1.461 MW
reported by source
First operational
2024-06-25
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

GSIC TSUBAME 2.5

Tokyo Institute of Technology · Japan

Operational
Power capacity
2.693 MW
reported by source
First operational
2014-06-01
as recorded in snapshot
NVIDIA Tesla K20XNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

GSIC TSUBAME 3.0

Tokyo Institute of Technology · Japan

Operational
Power capacity
1.525 MW
reported by source
First operational
2017-11-01
as recorded in snapshot
NVIDIA Tesla P100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

hessian.AI fortytwo

hessian.AI · Germany

Operational
Power capacity
0.525 MW
reported by source
First operational
2023-06-15
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

High-Performance Computing Center Stuttgart Hawk

University of Stuttgart · Germany

Operational
Power capacity
0.165 MW
reported by source
First operational
2021-09-20
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Horizon Compute Baobab Phase 1

Horizon Compute · United States of America

Operational
Power capacity
1.461 MW
reported by source
First operational
2024-02-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Horizon Compute Baobab Phase 2

Horizon Compute · United States of America

Operational
Power capacity
2.87 MW
reported by source
First operational
2025-03-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

HPE GreenLake for LLMs Q01

Hewlett Packard Enterprise · Canada

Operational
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely

HUMAIN Saudi Arabia Phase 2

Humain · Saudi Arabia

Planning
Power capacity
500 MW
reported by source
First operational
Not available
as recorded in snapshot
Public/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

HUMAIN Saudi Arabia/NVIDIA Phase 1

Humain · Saudi Arabia

Planning
Power capacity
63.063 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB300NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Hut 8 H100 Cluster

Hut 8 · United States of America

Operational
Power capacity
1.427 MW
reported by source
First operational
2024-09-26
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

IBM Blue Vela

IBM · United States of America

Operational
Power capacity
1.461 MW
reported by source
First operational
2024-07-07
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

IBM DYEUS

IBM · United States of America

Operational
Power capacity
0.197 MW
reported by source
First operational
2019-11-18
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

IBM Vela

IBM · United States of America

Operational
Power capacity
2.453 MW
reported by source
First operational
2022-05-30
as recorded in snapshot
NVIDIA A100 SXM4 80 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

iGenius Colosseum

iGenius · Italy

Planning
Power capacity
13.838 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Imbue 10k Cluster

Imbue · United States of America

Operational
Power capacity
14.524 MW
reported by source
First operational
2023-09-07
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Immunity Bio Cluster

ImmunityBio · United States of America

Operational
Power capacity
0.21 MW
reported by source
First operational
2020-04-01
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

IndiaAI Mission Supercomputer

Cloud · India

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Public/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Indiana University Big Red 200

Indiana University Bloomington · United States of America

Operational
Power capacity
0.22 MW
reported by source
First operational
2021-11-30
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 3 additional sources

Indiana University Bloomington Jetstream2

Indiana University Bloomington · United States of America

Operational
Power capacity
0.307 MW
reported by source
First operational
2022-02-20
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Inflection AI Cluster

Inflection AI · United States of America

Planning
Power capacity
31 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Inflection-2 training cluster

Inflection AI,CoreWeave · United States of America

Operational
Power capacity
7.262 MW
reported by source
First operational
2023-07-30
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Intel Stability Gaudi 2

Intel · United States of America

Operational
Power capacity
4.892 MW
reported by source
First operational
2024-03-11
as recorded in snapshot
Intel Habana Gaudi2IntelPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Iris Energy Prince George cluster

Iris Energy · Canada

Operational
Power capacity
1.164 MW
reported by source
First operational
2024-04-30
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

JAMSTEC ZettaScaler-2.0 Gyoukou

Japan Agency for Marine-Earth Science and Technology · Japan

Operational
Power capacity
0.316 MW
reported by source
First operational
2017-06-15
as recorded in snapshot
PEZY-SC2PEZYPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

JAMSTEC ZettaScaler-2.2 Gyoukou

Japan Agency for Marine-Earth Science and Technology · Japan

Operational
Power capacity
2.6 MW
reported by source
First operational
2017-11-15
as recorded in snapshot
PEZY-SC2PEZYPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Japan Atomic Energy Agency and Quantum and Radiological Science and Technology HPE SGI8600

Japan Atomic Energy Agency · Japan

Operational
Power capacity
0.713 MW
reported by source
First operational
2020-11-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Japanese Research Institute 1 Supercomputer 1

Unknown · Japan

Operational
Power capacity
0.554 MW
reported by source
First operational
2019-06-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIA
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Japanese Research Institute 2 Supercomputer 1

Unknown · Japan

Operational
Power capacity
0.531 MW
reported by source
First operational
2022-06-01
as recorded in snapshot
NVIDIA A100NVIDIA
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

JCAHPC Miyabi

Joint Center for Advanced High Performance Computing (JCAHPC) · Japan

Operational
Power capacity
1.57 MW
reported by source
First operational
2025-01-15
as recorded in snapshot
NVIDIA GH200NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Jean Zay Supercomputer Phase 1

GENCI · France

Operational
Power capacity
0.695 MW
reported by source
First operational
2019-06-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2 32 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Jean Zay Supercomputer Phase 2

GENCI · France

Operational
Power capacity
1.766 MW
reported by source
First operational
2020-06-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Jean Zay Supercomputer Phase 3

GENCI · France

Operational
Power capacity
2.077 MW
reported by source
First operational
2022-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Jean Zay Supercomputer Phase 4

GENCI · France

Operational
Power capacity
2.417 MW
reported by source
First operational
2024-09-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Jupiter, Jülich

EuroHPC JU,Julich Supercomputing Center · Germany

Operational
Power capacity
18 MW
reported by source
First operational
2025-06-10
as recorded in snapshot
NVIDIA GH200NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 4 additional sources

JUWELS-Booster

Julich Supercomputing Center · Germany

Operational
Power capacity
3.16 MW
reported by source
First operational
2020-11-16
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Karlsruher Institut für Technologie HoreKa

Karlsruhe Institute of Technology · Germany

Operational
Power capacity
0.632 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

KAUST Shaheen-III

King Abdullah University of Science and Technology (KAUST) · Saudi Arabia

Planning
Power capacity
5.3 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GH200NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

KDDI Sharp Sakai

KDDI · Japan

Planning
Power capacity
4.805 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Laboratório Nacional de Computação Científica Santos Dumont

Laboratório Nacional de Computação Científica · Brazil

Operational
Power capacity
0.245 MW
reported by source
First operational
2019-11-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Lambda Labs H100/H200

Lambda Labs · United States of America

Operational
Power capacity
46.476 MW
reported by source
First operational
2023-12-05
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

Lawrence Berkeley NL NERSC Perlmutter

US Department of Energy · United States of America

Operational
Power capacity
6.9 MW
reported by source
First operational
2021-05-17
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Lawrence Livermore NL El Capitan Phase 1

US Department of Energy · United States of America

Operational
Power capacity
0.793 MW
reported by source
First operational
2024-06-01
as recorded in snapshot
AMD Instinct MI300AAMDPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 3 additional sources

Lawrence Livermore NL El Capitan Phase 2

US Department of Energy · United States of America

Operational
Power capacity
35 MW
reported by source
First operational
2024-11-18
as recorded in snapshot
AMD Instinct MI300AAMDPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Lawrence Livermore NL Lassen Phase 1

US Department of Energy · United States of America

Operational
Power capacity
1.882 MW
reported by source
First operational
2018-11-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Lawrence Livermore NL Lassen Phase 2

US Department of Energy · United States of America

Operational
Power capacity
2.076 MW
reported by source
First operational
2020-08-19
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Lawrence Livermore NL RZAdams

US Department of Energy · United States of America

Operational
Power capacity
0.793 MW
reported by source
First operational
2024-06-01
as recorded in snapshot
AMD Instinct MI300AAMDPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Lawrence Livermore NL Sierra

US Department of Energy · United States of America

Operational
Power capacity
11.5 MW
reported by source
First operational
2018-06-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Lawrence Livermore NL Tuolumne

US Department of Energy · United States of America

Operational
Power capacity
5.661 MW
reported by source
First operational
2024-11-18
as recorded in snapshot
AMD Instinct MI300AAMDPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Leonardo SpA davinci-1

Leonardo SpA · Italy

Operational
Power capacity
0.28 MW
reported by source
First operational
2020-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

LeptonAI H100 Cluster

Lepton AI · United States of America

Operational
Power capacity
1.461 MW
reported by source
First operational
2024-08-20
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Los Alamos NL Chicoma

US Department of Energy · United States of America

Operational
Power capacity
0.44 MW
reported by source
First operational
2021-12-20
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Los Alamos NL Venado

US Department of Energy · United States of America

Operational
Power capacity
2.777 MW
reported by source
First operational
2024-04-16
as recorded in snapshot
NVIDIA GH200NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Magic G4 Google Cloud Rental

Google · United States of America

Operational
Power capacity
11.211 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Mare Nostrum 5

Barcelona Supercomputing Center,EuroHPC JU · Spain

Operational
Power capacity
6 MW
reported by source
First operational
2023-11-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Max-Planck-Gesellschaft Raven

Max Planck Society · Germany

Operational
Power capacity
0.664 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Meta $200B Campus Rumor

Meta AI · United States of America

Planning
Power capacity
5000 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely

Meta 100k

Meta AI · United States of America

Operational
Power capacity
142.688 MW
reported by source
First operational
2024-10-30
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 3 additional sources

Meta 2017 P100 Cluster

Meta AI · United States of America

Operational
Power capacity
0.673 MW
reported by source
First operational
2017-06-01
as recorded in snapshot
NVIDIA P100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Meta 2017 V100 Cluster

Meta AI · United States of America

Operational
Power capacity
15.495 MW
reported by source
First operational
2017-10-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Meta GenAI 2024a

Meta AI · United States of America

Operational
Power capacity
35.067 MW
reported by source
First operational
2024-03-12
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Meta GenAI 2024b

Meta AI · United States of America

Operational
Power capacity
35.067 MW
reported by source
First operational
2024-03-12
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Meta Louisiana Datacenter

Meta AI · United States of America

Planning
Power capacity
2260 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Meta Research SuperCluster (RSC-1) Phase 1

Meta AI · United States of America

Operational
Power capacity
5.179 MW
reported by source
First operational
2022-01-24
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Meta Research SuperCluster (RSC-1) Phase 2

Meta AI · United States of America

Operational
Power capacity
13.279 MW
reported by source
First operational
2023-05-18
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Meta Research SuperCluster 2 (RSC-2)

Meta AI · United States of America

Operational
Power capacity
6.639 MW
reported by source
First operational
2023-10-31
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Meta Temple Texas

Meta AI · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Microsoft Air Gapped Supercomputer

Microsoft · United States of America

Operational
Power capacity
Not available
not available
First operational
2024-05-07
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Ares/Maia

Microsoft · United States of America

Operational
Power capacity
2.125 MW
reported by source
First operational
2023-11-15
as recorded in snapshot
Maia 100 (M100)MicrosoftPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Microsoft Azure Eagle

Microsoft · United States of America

Operational
Power capacity
20.914 MW
reported by source
First operational
2023-11-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Azure Immunity Bio

Microsoft · United States of America

Operational
Power capacity
0.819 MW
reported by source
First operational
2020-04-01
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Azure Meta AI Rental

Microsoft · United States of America

Operational
Power capacity
4.6 MW
reported by source
First operational
2022-05-27
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Azure MLPerf 3.1 Submission

Microsoft · United States of America

Operational
Power capacity
15.616 MW
reported by source
First operational
2023-11-08
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Azure ND H100 v5 VM

Microsoft · United States of America

Operational
Power capacity
5.809 MW
reported by source
First operational
2023-03-13
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Microsoft Azure ND v2 Largest Stated

Microsoft · United States of America

Operational
Power capacity
0.533 MW
reported by source
First operational
2019-11-18
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Azure Pioneer-EUS

Microsoft · United States of America

Operational
Power capacity
1.127 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Azure Pioneer-SCUS

Microsoft · United States of America

Operational
Power capacity
1.127 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Azure Pioneer-WEU

Microsoft · Netherlands

Operational
Power capacity
1.127 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Azure Pioneer-WUS2

Microsoft · United States of America

Operational
Power capacity
1.127 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Azure Voyager-EUS2

Microsoft · United States of America

Operational
Power capacity
1.814 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Microsoft Explorer-WUS3

Microsoft · United States of America

Operational
Power capacity
1.992 MW
reported by source
First operational
2023-06-01
as recorded in snapshot
AMD Radeon Instinct MI250XAMDPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Microsoft GPT-4 cluster

Microsoft,OpenAI · United States of America

Operational
Power capacity
21.294 MW
reported by source
First operational
2022-04-30
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 3 additional sources

Microsoft NVIDIA partnership

Microsoft · United States of America

Planning
Power capacity
21.785 MW
reported by source
First operational
2023-05-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely

Microsoft Research Hypercluster

Microsoft · United States of America

Operational
Power capacity
0.384 MW
reported by source
First operational
2019-11-01
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Microsoft Sweden Gävle

Microsoft · Sweden

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Microsoft Sweden Sandviken

Microsoft · Sweden

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Microsoft Sweden Staffanstorp

Microsoft · Sweden

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

MIT LLSC TX-GAIA

US Department of Defense · United States of America

Operational
Power capacity
2.572 MW
reported by source
First operational
2019-09-26
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

MIT Supercloud

Massachusetts Institute of Technology (MIT) · United States of America

Operational
Power capacity
0.32 MW
reported by source
First operational
2020-09-21
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

MITRE Federal AI Sandbox

MITRE · United States of America

Planning
Power capacity
0.359 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Moscow State University Lomonosov 2

Moscow State Univeristy · Russia

Operational
Power capacity
0.86 MW
reported by source
First operational
2016-06-15
as recorded in snapshot
NVIDIA Tesla K40mNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

MSU-270

Moscow State Univeristy · Russia

Operational
Power capacity
Not available
not available
First operational
2023-09-02
as recorded in snapshot
Public
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

MTS Grom

MTS Systems Corporation (MTS) · Russia

Operational
Power capacity
0.137 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Nagoya University Flow Type II (Furo)

Nagoya University · Japan

Operational
Power capacity
0.579 MW
reported by source
First operational
2020-07-30
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

NAVER Corp Sejong

NAVER · Korea (Republic of)

Operational
Power capacity
1.859 MW
reported by source
First operational
2023-11-15
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Naver DGX Superpod

NAVER · Korea (Republic of)

Operational
Power capacity
0.978 MW
reported by source
First operational
2020-10-05
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

NCI Australia Gadi

National Computational Infrastructure Australia · Australia

Operational
Power capacity
0.419 MW
reported by source
First operational
2020-01-23
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

ND A100 v4

Microsoft · United States of America

Operational
Power capacity
1.718 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Nebius 8k Finland Phase 1

Nebius AI · Finland

Operational
Power capacity
11.415 MW
reported by source
First operational
2024-05-10
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Nebius Finland Phase 2

Nebius AI · Finland

Planning
Power capacity
84.084 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Nebius ISEG

Nebius AI · Finland

Operational
Power capacity
2.246 MW
reported by source
First operational
2023-11-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Nebius Kansas City Phase 1

Nebius AI · United States of America

Operational
Power capacity
5 MW
reported by source
First operational
2025-04-15
as recorded in snapshot
NVIDIA H200 SXMNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Nebius Kansas City Phase 2

Nebius AI · United States of America

Planning
Power capacity
40 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA B200NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Nebius New Jersey

Nebius AI · United States of America

Planning
Power capacity
300 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

NEC Corp Japan Supercomputer

NEC Corporation · Japan

Operational
Power capacity
0.77 MW
reported by source
First operational
2023-07-24
as recorded in snapshot
NVIDIA A100 SXM4 80 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Neevcloud cluster 1

NeevCloud · India

Operational
Power capacity
1.461 MW
reported by source
First operational
2024-04-29
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely
Primary citation 1 additional source

Neevcloud planned GPUs

NeevCloud · India

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

NexGen Cloud Hyperstack AQ Compute Supercomputer

NexGen Cloud · Norway

Operational
Power capacity
23.378 MW
reported by source
First operational
2024-04-19
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

NFDG Andromeda Phase 1

Nat Friedman and Daniel Gross · United States of America

Operational
Power capacity
3.648 MW
reported by source
First operational
2023-06-13
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

NFDG Andromeda Phase 2

Nat Friedman and Daniel Gross · United States of America

Operational
Power capacity
5.809 MW
reported by source
First operational
2024-07-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

NHN Cloud's National AI Data Center

NHN Corporation · Korea (Republic of)

Operational
Power capacity
1.452 MW
reported by source
First operational
2023-11-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

NHRI Taiwan Supercomputer (NHRI-1)

National Health Research Institutes Taiwan · Taiwan

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Public
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Northern Data Group Njored Taiga Cloud Island 5

Northern Data Group · United Kingdom of Great Britain and Northern Ireland

Operational
Power capacity
2.922 MW
reported by source
First operational
2024-03-30
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Northern Data Group Taiga Cloud NO1 Island 1

Northern Data Group · Norway

Operational
Power capacity
2.922 MW
reported by source
First operational
2024-03-30
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Northern Data Group Taiga Cloud NO1 Island 2

Northern Data Group · Norway

Operational
Power capacity
2.922 MW
reported by source
First operational
2024-03-30
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Novo Nordisk Gefion

Novo Nordisk Foundation,Danish Centre for AI Innovation,Export and Investment Fund of Denmark · Denmark

Operational
Power capacity
2.931 MW
reported by source
First operational
2024-10-23
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

NSC Berzelius Phase 1

Linköping University · Sweden

Operational
Power capacity
0.412 MW
reported by source
First operational
2021-03-23
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

NSC Berzelius Phase 2

Linköping University · Sweden

Operational
Power capacity
0.624 MW
reported by source
First operational
2023-06-01
as recorded in snapshot
NVIDIA A100 SXM4 80 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Nscale Loughton

Cloud · United Kingdom of Great Britain and Northern Ireland

Planning
Power capacity
90 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

NSCC ASPIRE 2A Phase 1

National Supercomputing Center Singapore · Singapore

Operational
Power capacity
0.218 MW
reported by source
First operational
2022-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

NSCC ASPIRE 2A Phase 2

National Supercomputing Center Singapore · Singapore

Operational
Power capacity
0.3 MW
reported by source
First operational
2022-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

NSTDA Supercomputer Center (ThaiSC) LANTA

National Science and Technology Development Agency (NSTDA) · Thailand

Operational
Power capacity
0.542 MW
reported by source
First operational
2022-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

NVIDIA Cambridge-1

NVIDIA · United Kingdom of Great Britain and Northern Ireland

Operational
Power capacity
0.55 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

NVIDIA Circe

NVIDIA · United States of America

Operational
Power capacity
0.396 MW
reported by source
First operational
2018-11-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

NVIDIA CoreWeave Eos-DFW Phase 1

NVIDIA,CoreWeave · United States of America

Operational
Power capacity
15.616 MW
reported by source
First operational
2023-11-08
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

NVIDIA CoreWeave Eos-DFW Rumored Phase 2

NVIDIA,CoreWeave · United States of America

Planning
Power capacity
44.845 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

NVIDIA Coreweave MLPerf v3.0 Submission 2023

NVIDIA,CoreWeave,Inflection AI · United States of America

Operational
Power capacity
5.205 MW
reported by source
First operational
2023-06-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

NVIDIA Eos Phase 1

NVIDIA · United States of America

Operational
Power capacity
1.487 MW
reported by source
First operational
2023-05-22
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

NVIDIA Eos Phase 2

NVIDIA · United States of America

Operational
Power capacity
6.692 MW
reported by source
First operational
2023-11-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

NVIDIA In-house DGX A100 Cluster

NVIDIA · United States of America

Operational
Power capacity
0.349 MW
reported by source
First operational
2020-05-14
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

NVIDIA Israel Blackwell Supercomputer

NVIDIA · Israel

Planning
Power capacity
30 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

NVIDIA Israel-1 Phase 1

NVIDIA · Israel

Operational
Power capacity
1.487 MW
reported by source
First operational
2023-11-23
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

NVIDIA Israel-1 Phase 2

NVIDIA · Israel

Operational
Power capacity
2.922 MW
reported by source
First operational
2024-11-20
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

NVIDIA SATURN V Phase 1

NVIDIA · United States of America

Operational
Power capacity
0.591 MW
reported by source
First operational
2016-11-01
as recorded in snapshot
NVIDIA P100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

NVIDIA SATURN V Phase 2

NVIDIA · United States of America

Operational
Power capacity
3.632 MW
reported by source
First operational
2018-03-26
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

NVIDIA SATURN V Phase 3

NVIDIA · United States of America

Operational
Power capacity
3.704 MW
reported by source
First operational
2020-05-14
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely
Primary citation 3 additional sources

NVIDIA SATURN V Volta

NVIDIA · United States of America

Operational
Power capacity
0.186 MW
reported by source
First operational
2017-11-01
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

NVIDIA Selene Phase 1

NVIDIA · United States of America

Operational
Power capacity
2.408 MW
reported by source
First operational
2020-06-22
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

NVIDIA Selene Phase 2

NVIDIA · United States of America

Operational
Power capacity
4.739 MW
reported by source
First operational
2020-11-30
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

NVIDIA Taipei-1

NVIDIA · Taiwan

Operational
Power capacity
0.887 MW
reported by source
First operational
2024-06-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

NVIDIA Tethys

NVIDIA · United States of America

Operational
Power capacity
0.126 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Oak Ridge NL Frontier

US Department of Energy · United States of America

Operational
Power capacity
40 MW
reported by source
First operational
2022-05-30
as recorded in snapshot
AMD Radeon Instinct MI250XAMDPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Oak Ridge NL Summit

US Department of Energy · United States of America

Decommissioned
Power capacity
13 MW
reported by source
First operational
2018-06-08
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Oak Ridge NL Titan

US Department of Energy · United States of America

Decommissioned
Power capacity
15.805 MW
reported by source
First operational
2012-10-29
as recorded in snapshot
NVIDIA Tesla K20XNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

OneAsia OBON Clusters

OneAsia · Thailand

Planning
Power capacity
5.606 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

OpenAI Stargate Abilene Oracle OCI Supercluster Phase 1

Oracle · United States of America

Planning
Power capacity
240.24 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

OpenAI Stargate Abilene Oracle OCI Supercluster Phase 2

Oracle · United States of America

Planning
Power capacity
940.944 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB300NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

OpenAI Stargate Abilene Oracle OCI Supercluster Phase 3

Oracle · United States of America

Planning
Power capacity
2200 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

OpenAI/Microsoft Goodyear Arizona

Microsoft,OpenAI · United States of America

Operational
Power capacity
142.688 MW
reported by source
First operational
2024-10-02
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 1

OpenAI,Microsoft · United States of America

Planning
Power capacity
300 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 2

OpenAI,Microsoft · United States of America

Planning
Power capacity
1500 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

Opera Iceland KEF-1 SuperPOD

Opera · Iceland

Operational
Power capacity
0.354 MW
reported by source
First operational
2024-02-28
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Oracle $10B Saudi Arabia Investment

Oracle · Saudi Arabia

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Oracle 2020 A100 Cluster

Oracle · United States of America

Operational
Power capacity
0.447 MW
reported by source
First operational
2020-09-30
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Oracle OCI MI300x

Oracle · United States of America

Operational
Power capacity
25.048 MW
reported by source
First operational
2024-11-15
as recorded in snapshot
AMD Instinct MI300XAMDPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Oracle OCI Supercluster A100s

Oracle · United States of America

Operational
Power capacity
27.195 MW
reported by source
First operational
2023-11-15
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Oracle OCI Supercluster B200s

Oracle · United States of America

Planning
Power capacity
262.406 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA B200NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Oracle OCI Supercluster H100s

Oracle · United States of America

Operational
Power capacity
23.378 MW
reported by source
First operational
2024-04-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 3 additional sources

Oracle OCI Supercluster H200s

Oracle · United States of America

Operational
Power capacity
93.512 MW
reported by source
First operational
2024-11-21
as recorded in snapshot
NVIDIA H200 SXMNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Osaka University SQUID

Osaka University · Japan

Operational
Power capacity
0.289 MW
reported by source
First operational
2021-05-01
as recorded in snapshot
NVIDIA A100 SXM4 80 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

PanaAI AUS AISF

PanaAI · Australia

Planning
Power capacity
5.729 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H200 SXMNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Paper on AFM-server

Google · United States of America

Operational
Power capacity
2.839 MW
reported by source
First operational
2024-06-10
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Paper on AlphaCode

Google · United States of America

Operational
Power capacity
1.357 MW
reported by source
First operational
2022-02-08
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on AlphaZero

Google · United States of America

Operational
Power capacity
0.88 MW
reported by source
First operational
2017-12-05
as recorded in snapshot
Google TPU v1GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Paper on CoCa

Google · United States of America

Operational
Power capacity
0.741 MW
reported by source
First operational
2022-05-04
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on Flamingo

Google · United States of America

Operational
Power capacity
0.556 MW
reported by source
First operational
2022-04-29
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on Gemma 2 9B

Google · United States of America

Operational
Power capacity
1.419 MW
reported by source
First operational
2024-06-27
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on GLaM

Google · United States of America

Operational
Power capacity
0.374 MW
reported by source
First operational
2021-12-13
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on Gopher

Google DeepMind · United States of America

Operational
Power capacity
1.935 MW
reported by source
First operational
2021-12-08
as recorded in snapshot
Google TPU v3GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on HyperCLOVA

NAVER · Korea (Republic of)

Operational
Power capacity
0.88 MW
reported by source
First operational
2021-09-10
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on Megatron-LM

NVIDIA · United States of America

Operational
Power capacity
0.284 MW
reported by source
First operational
2019-09-17
as recorded in snapshot
NVIDIA Tesla V100 DGXS 32 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on Minerva

Google · United States of America

Operational
Power capacity
0.371 MW
reported by source
First operational
2022-06-29
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on Minibatch SGD

Meta AI · United States of America

Operational
Power capacity
0.15 MW
reported by source
First operational
2017-06-08
as recorded in snapshot
NVIDIA P100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on PaLI

Google · United States of America

Operational
Power capacity
0.371 MW
reported by source
First operational
2022-09-14
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on PaLM

Google · United States of America

Operational
Power capacity
2.224 MW
reported by source
First operational
2022-04-05
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on RoBERTa

Meta AI · United States of America

Operational
Power capacity
0.568 MW
reported by source
First operational
2019-07-26
as recorded in snapshot
NVIDIA Tesla V100 DGXS 32 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Paper on ViT-22B

Google · United States of America

Operational
Power capacity
0.361 MW
reported by source
First operational
2023-02-10
as recorded in snapshot
Google TPU v4GooglePrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

PARAM Siddhi-AI Phase 1

Center for Development of Advanced Computing (C-DAC) · India

Operational
Power capacity
0.294 MW
reported by source
First operational
2020-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

ParTec ELBJUWEL

Helmholtz-Zentrum Dresden-Rossendorf (HZDR) · Germany

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Public
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Pawsey Supercomputing Centre Setonix

Pawsey Supercomputing Centre · Australia

Operational
Power capacity
0.832 MW
reported by source
First operational
2022-07-01
as recorded in snapshot
AMD Radeon Instinct MI250XAMDPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

PCSS Poznan Proxima

Polish Academy of Sciences · Poland

Operational
Power capacity
0.497 MW
reported by source
First operational
2024-06-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Petrobras Atlas

Petrobras · Brazil

Operational
Power capacity
0.979 MW
reported by source
First operational
2020-06-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Petrobras Dragão

Petrobras · Brazil

Operational
Power capacity
1.661 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Petrobras Fênix Phase 1

Petrobras · Brazil

Operational
Power capacity
0.523 MW
reported by source
First operational
2019-06-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Petrobras Fênix Phase 2

Petrobras · Brazil

Operational
Power capacity
0.698 MW
reported by source
First operational
2020-06-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Petrobras Gaia

Petrobras · Brazil

Operational
Power capacity
0.977 MW
reported by source
First operational
2023-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Petrobras Pegasus (Pégaso)

Petrobras · Brazil

Operational
Power capacity
1.804 MW
reported by source
First operational
2022-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

PLaMO-13B training cluster

Preferred Networks Inc · Japan

Operational
Power capacity
0.398 MW
reported by source
First operational
2023-09-25
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

Preferred Networks MN-1b

Preferred Networks Inc · Japan

Decommissioned
Power capacity
0.939 MW
reported by source
First operational
2018-07-30
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Preferred Networks MN-2

Preferred Networks Inc · Japan

Operational
Power capacity
0.682 MW
reported by source
First operational
2019-07-30
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Princeton Della Phase 1

Princeton University · United States of America

Operational
Power capacity
0.262 MW
reported by source
First operational
2023-02-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Princeton Della Phase 2

Princeton University · United States of America

Operational
Power capacity
0.68 MW
reported by source
First operational
2024-03-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Project Ceiba Phase 1

Amazon,NVIDIA · United States of America

Planning
Power capacity
22.961 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GH200NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely

Project Ceiba Phase 2

Amazon,NVIDIA · United States of America

Planning
Power capacity
49.816 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Project Rainier

Amazon · United States of America

Planning
Power capacity
350 MW
reported by source
First operational
Not available
as recorded in snapshot
Amazon Trainium2Amazon AWSPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Recursion BioHive-1

Recursion Pharmaceuticals · United States of America

Operational
Power capacity
0.275 MW
reported by source
First operational
2021-04-15
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Recursion BioHive-2

Recursion Pharmaceuticals · United States of America

Operational
Power capacity
0.719 MW
reported by source
First operational
2024-05-13
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Reliance Industries Supercomputer

Reliance Industries · India

Planning
Power capacity
1000 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

RPI AiMOS

Rensselaer Polytechnic Institute · United States of America

Operational
Power capacity
0.929 MW
reported by source
First operational
2019-12-11
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

RPI AiMOSx NPL Cluster

Rensselaer Polytechnic Institute · United States of America

Operational
Power capacity
0.21 MW
reported by source
First operational
2020-06-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

RPI Supercomputer 2

Rensselaer Polytechnic Institute · United States of America

Operational
Power capacity
0.398 MW
reported by source
First operational
2020-06-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

SAKURA Internet 2019 V100 Supercomputer

Sakura Internet · Japan

Operational
Power capacity
0.512 MW
reported by source
First operational
2019-06-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Sakura's B200s Phase 2

Sakura Internet · Japan

Planning
Power capacity
16.416 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA B200NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Sakura's H100s Phase 1

Sakura Internet · Japan

Operational
Power capacity
2.877 MW
reported by source
First operational
2024-07-31
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Sandia NL El Dorado

US Department of Energy · United States of America

Operational
Power capacity
1.856 MW
reported by source
First operational
2024-11-18
as recorded in snapshot
AMD Instinct MI300AAMDPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Saudi Aramco Dammam-7

Saudi Aramco · Saudi Arabia

Operational
Power capacity
5.098 MW
reported by source
First operational
2021-01-21
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Saudi Aramco Tuwaiq-1

Saudi Aramco · Saudi Arabia

Operational
Power capacity
0.594 MW
reported by source
First operational
2024-06-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Saudi Data & AI Authority Sovereign AI factory

Saudi Data and Artificial Intelligence Authority · Saudi Arabia

Planning
Power capacity
12.012 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

SberCloud Christofari

SberCloud · Russia

Operational
Power capacity
0.799 MW
reported by source
First operational
2019-11-09
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

SberCloud Christofari Neo

SberCloud · Russia

Operational
Power capacity
0.68 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100 SXM4 80 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Scaleway Nabuchodonosor

Iliad SA · France

Operational
Power capacity
1.476 MW
reported by source
First operational
2023-10-05
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

SENAI CIMATEC Ogbon Cimatec/Petrobras

SENAI CIMATEC · Brazil

Operational
Power capacity
0.208 MW
reported by source
First operational
2019-11-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Sesterce Grand Est France A

Sesterce · France

Planning
Power capacity
300 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Sesterce Grand Est France B

Sesterce · France

Planning
Power capacity
300 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Sesterce Southern France 250MW

Sesterce · France

Planning
Power capacity
250 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Sesterce Synapse Phase 1

Sesterce · France

Operational
Power capacity
2.922 MW
reported by source
First operational
2024-09-30
as recorded in snapshot
NVIDIA H200 SXMNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Sesterce Synapse Phase 2

Sesterce · France

Operational
Power capacity
5.74 MW
reported by source
First operational
2025-01-15
as recorded in snapshot
NVIDIA H200 SXMNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Sesterce Valence

Sesterce · France

Planning
Power capacity
96.096 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

SIAM AI HGX

SIAM AI · Thailand

Operational
Power capacity
1.461 MW
reported by source
First operational
2024-09-12
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

SiDi IARA

SiDi · Brazil

Operational
Power capacity
0.172 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Simon Fraser University/Compute Canada Cedar

Compute Canada · Canada

Operational
Power capacity
0.555 MW
reported by source
First operational
2020-06-01
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Singtel DC Tuas

Singtel · Singapore

Planning
Power capacity
58 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

SoftBank CHIE-2

Softbank · Japan

Operational
Power capacity
2.911 MW
reported by source
First operational
2024-10-31
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

SoftBank CHIE-3

Softbank · Japan

Operational
Power capacity
2.911 MW
reported by source
First operational
2024-10-31
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

SoftBank Planned B200 Superpod

Softbank · Japan

Planning
Power capacity
8.008 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA B200NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

SoftBank Planned GB200

Softbank · Japan

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Softbank SuperPOD

Softbank · Japan

Operational
Power capacity
1.7 MW
reported by source
First operational
2023-09-30
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

South Korea Planned 3GW Cluster

Unknown · Korea (Republic of)

Planning
Power capacity
3000 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Stargate UAE Phase 1

Stargate (OpenAI) · United Arab Emirates

Planning
Power capacity
200 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB300NVIDIAPublic/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

Stargate UAE Phase 2

Stargate (OpenAI) · United Arab Emirates

Planning
Power capacity
1000 MW
reported by source
First operational
Not available
as recorded in snapshot
Public/Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

SURF Snellius Phase 1

SURF · Netherlands

Operational
Power capacity
0.247 MW
reported by source
First operational
2021-09-16
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

SURF Snellius Phase 3

SURF · Netherlands

Operational
Power capacity
0.737 MW
reported by source
First operational
2024-07-11
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

Sustainable Metal Cloud Singapore Phase 1

SMC - Sustainable Metal Cloud · Singapore

Operational
Power capacity
1.461 MW
reported by source
First operational
2024-05-30
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Sustainable Metal Cloud Singapore Phase 2

SMC - Sustainable Metal Cloud · Singapore

Planning
Power capacity
7.007 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

TACC Frontera

University of Texas at Austin · United States of America

Operational
Power capacity
0.482 MW
reported by source
First operational
2019-08-31
as recorded in snapshot
NVIDIA Quadro RTX 5000NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

TACC Horizon

University of Texas at Austin · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Public
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

TACC Lonestar6

University of Texas at Austin · United States of America

Operational
Power capacity
0.161 MW
reported by source
First operational
2022-11-14
as recorded in snapshot
NVIDIA A100 PCIeNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

TACC Longhorn

University of Texas at Austin · United States of America

Decommissioned
Power capacity
0.298 MW
reported by source
First operational
2019-11-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Taiwania 2

National Applied Research Laboratories Taiwan · Taiwan

Operational
Power capacity
1.5 MW
reported by source
First operational
2018-11-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Tata Group GH200 supercomputer

Tata Group · India

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
NVIDIA GH200NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely

Telangana Yotta H1 Hyderbad AI City Cluster Phase 1

Government of Telangana · India

Planning
Power capacity
5.606 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Telangana Yotta Hyderbad AI City Cluster Phase 2

Government of Telangana · India

Planning
Power capacity
50 MW
reported by source
First operational
Not available
as recorded in snapshot
Public
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

TensorWave MI300X Cluster 1 Phase 1

TensorWave · United States of America

Operational
Power capacity
1.529 MW
reported by source
First operational
2024-04-01
as recorded in snapshot
AMD Instinct MI300XAMDPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

TensorWave MI300X Cluster 1 Phase 2

TensorWave · United States of America

Planning
Power capacity
15.015 MW
reported by source
First operational
Not available
as recorded in snapshot
AMD Instinct MI300XAMDPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

TensorWave MI300X Cluster 2

TensorWave · United States of America

Planning
Power capacity
15.015 MW
reported by source
First operational
Not available
as recorded in snapshot
AMD Instinct MI300XAMDPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Tesla 10k H100 Cluster

Tesla · United States of America

Operational
Power capacity
14.524 MW
reported by source
First operational
2023-08-28
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Tesla A100 Cluster Phase 1

Tesla · United States of America

Operational
Power capacity
4.948 MW
reported by source
First operational
2021-06-20
as recorded in snapshot
NVIDIA A100 SXM4 80 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Tesla A100 Cluster Phase 2

Tesla · United States of America

Operational
Power capacity
6.269 MW
reported by source
First operational
2022-08-16
as recorded in snapshot
NVIDIA A100 SXM4 80 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Tesla Auto-Labeling Cluster

Tesla · United States of America

Operational
Power capacity
1.505 MW
reported by source
First operational
2021-08-20
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Tesla Buffalo Dojo

Tesla · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Tesla D1 DojoTeslaPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Tesla Cortex Phase 1

Tesla · United States of America

Operational
Power capacity
71.344 MW
reported by source
First operational
2024-11-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Tesla Cortex Phase 2

Tesla · United States of America

Planning
Power capacity
70.07 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

Tesla Cortex Phase 3

Tesla · United States of America

Planning
Power capacity
140.14 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

Tesla Dojo 1 Phase 1

Tesla · United States of America

Planning
Power capacity
2.402 MW
reported by source
First operational
Not available
as recorded in snapshot
Tesla D1 DojoTeslaPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

Tesla Dojo 1 Planned Phase 2

Tesla · United States of America

Planning
Power capacity
Not available
not available
First operational
Not available
as recorded in snapshot
Tesla D1 DojoTeslaPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Tesla Earnings Call Claim

Tesla · United States of America

Operational
Power capacity
49.941 MW
reported by source
First operational
2024-03-31
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely
Primary citation 1 additional source

Tesla Training Cluster

Tesla · United States of America

Operational
Power capacity
3.464 MW
reported by source
First operational
2021-08-20
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Texas A&M Grace

Texas A&M · United States of America

Operational
Power capacity
0.172 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Together AI H100 Cluster

Together · United States of America

Operational
Power capacity
6.425 MW
reported by source
First operational
2023-10-16
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

together.ai 36k GB200s

Together · United States of America

Planning
Power capacity
86.486 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

TotalEnergies Pangea III

TotalEnergies · France

Operational
Power capacity
2.489 MW
reported by source
First operational
2019-06-18
as recorded in snapshot
NVIDIA V100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

TSUBAME4.0

Tokyo Institute of Technology · Japan

Operational
Power capacity
1.364 MW
reported by source
First operational
2024-04-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 1 additional source

TU Dresden AlphaCentauri

Technische Universität Dresden · Germany

Operational
Power capacity
0.288 MW
reported by source
First operational
2021-02-28
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

U.S. Army Jean

US Department of Defense · United States of America

Operational
Power capacity
0.241 MW
reported by source
First operational
2021-05-30
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Ubilink.AI Supercomputer

Ubilink AI · Taiwan

Operational
Power capacity
1.782 MW
reported by source
First operational
2024-11-18
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Universitaet Frankfurt Goethe-NHR

Goethe University Frankfurt · Germany

Operational
Power capacity
0.332 MW
reported by source
First operational
2023-06-01
as recorded in snapshot
AMD Instinct MI210AMDPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

University of Bristol Isambard-AI

UK Research and Innovation · United Kingdom of Great Britain and Northern Ireland

Operational
Power capacity
7.635 MW
reported by source
First operational
2025-06-15
as recorded in snapshot
NVIDIA GH200NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

University of Cambridge Wilkes-3

University of Cambridge · United Kingdom of Great Britain and Northern Ireland

Operational
Power capacity
0.258 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

University of Edinburgh DiRAC Tursa

Distributed Research using Advanced Computing (DiRAC) · United Kingdom of Great Britain and Northern Ireland

Operational
Power capacity
0.43 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

University of Florida HiPerGator 3.0 Superpod

University of Florida · United States of America

Operational
Power capacity
1.026 MW
reported by source
First operational
2021-01-31
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

University of Illinois NCSA Delta

University of Illinois Urbana-Champaign (UIUC) · United States of America

Operational
Power capacity
0.664 MW
reported by source
First operational
2022-10-11
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

University of Minnesota Agate

University of Minnesota · United States of America

Operational
Power capacity
0.227 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

University of Oxford Jade2

University of Oxford · United Kingdom of Great Britain and Northern Ireland

Operational
Power capacity
0.202 MW
reported by source
First operational
2020-11-01
as recorded in snapshot
NVIDIA Tesla V100 SXM2NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

University of Tokyo Wisteria/BDEC-01 (Aquarius)

The University of Tokyo · Japan

Operational
Power capacity
0.324 MW
reported by source
First operational
2021-06-01
as recorded in snapshot
NVIDIA A100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

University of Tsukuba Cygnus

University of Tsukuba · Japan

Operational
Power capacity
0.213 MW
reported by source
First operational
2019-04-30
as recorded in snapshot
NVIDIA V100NVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

US Government Supercomputer 1

United States Government · United States of America

Operational
Power capacity
2.886 MW
reported by source
First operational
2014-11-01
as recorded in snapshot
NVIDIA Tesla K40cNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

US Government Supercomputer 2

United States Government · United States of America

Operational
Power capacity
2.886 MW
reported by source
First operational
2015-06-01
as recorded in snapshot
NVIDIA Tesla K40cNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Vingroup VinAI Research Superpod

Vingroup · Vietnam

Operational
Power capacity
0.137 MW
reported by source
First operational
2021-05-30
as recorded in snapshot
NVIDIA A100NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Voltage Park Location 5

Voltage Park · United States of America

Planning
Power capacity
5.729 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Voltage Park Location 6

Voltage Park · United States of America

Planning
Power capacity
5.729 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Voltage Park Texas Phase 1

Voltage Park · United States of America

Operational
Power capacity
1.427 MW
reported by source
First operational
2024-02-27
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

Voltage Park Texas Phase 2

Voltage Park · United States of America

Planning
Power capacity
5.729 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Voltage Park Utah

Voltage Park · United States of America

Planning
Power capacity
5.729 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Voltage Park Virginia

Voltage Park · United States of America

Planning
Power capacity
5.729 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Voltage Park Washington

Voltage Park · United States of America

Planning
Power capacity
5.729 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

Vultr Chicago Cluster

Vultr · United States of America

Operational
Power capacity
4.586 MW
reported by source
First operational
2024-12-11
as recorded in snapshot
AMD Instinct MI300XAMDPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Wonder Valley Datacenter Phase 1

Unknown · Canada

Planning
Power capacity
1400 MW
reported by source
First operational
Not available
as recorded in snapshot
Private
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Unlikely

Wroclaw Centre for Networking and Supercomputing Lem

Wroclaw Tech (Wrocław University of Science and Technology) · Poland

Operational
Power capacity
0.434 MW
reported by source
First operational
2024-06-01
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPublic
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

xAI Colossus 2 Memphis Phase 2

xAI · United States of America

Planning
Power capacity
1563.562 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 3 additional sources

xAI Colossus Memphis Phase 1

xAI · United States of America

Operational
Power capacity
150 MW
reported by source
First operational
2024-09-02
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

xAI Colossus Memphis Phase 2

xAI · United States of America

Operational
Power capacity
280.28 MW
reported by source
First operational
2025-02-18
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 2 additional sources

xAI Fulton Georgia

xAI · United States of America

Planning
Power capacity
20 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely
Primary citation 1 additional source

Yandex Chervonenkis

Yandex · Russia

Operational
Power capacity
1.368 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100 SXM4 80 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Yandex Galushkin

Yandex · Russia

Operational
Power capacity
0.935 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100 SXM4 80 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Yandex Lyapunov

Yandex · Russia

Operational
Power capacity
0.942 MW
reported by source
First operational
2021-11-01
as recorded in snapshot
NVIDIA A100 SXM4 40 GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed

Yotta Shakti Cloud NM1 Phase 1

Yotta Data Services · India

Operational
Power capacity
5.845 MW
reported by source
First operational
2024-05-15
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 3 additional sources

Yotta Shakti Cloud NM1 Phase 2

Yotta Data Services · India

Planning
Power capacity
22.961 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA H100 SXM5 80GBNVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Confirmed
Primary citation 2 additional sources

YTL AI Johor

YTL Power · Malaysia

Planning
Power capacity
37.064 MW
reported by source
First operational
Not available
as recorded in snapshot
NVIDIA GB200 NVL2 (per GPU)NVIDIAPrivate
Epoch AI · CC BY · archived 2025-08-23
Source certainty: Likely

Need deeper intelligence on these facilities?

This archival directory is a public reference surface. Compute Desk can combine current, configured sources with your workspace evidence when those integrations are available.